Friday, October 16, 2009

Expert Choice 11.5下載

Sheikh Khalifa Bridge


Regular visitors can go to the blog posts about the Saadiyat Iceland (29.12.2008) and bridge to Saadiyat Iceland (17.10.2008) recall. In these articles I had written about a new bridge and the highway which was then still under construction. Yesterday, this gigantic structure was opened. It provides the Road now a highway with 10 lanes ( 5 in each direction) from Abu Dhabi via Saadiyat and Yas Iceland Iceland Dubai.
The two major cities are by the highway about 15 to 20 minutes closer together.
on Yas Iceland by the way, held on 1 November, the

F1 Etihad Airways Abu Dhabi Grand Prix .

The opening of the new motorway at this point is not about words from.

The first two pictures are still from the construction of the bridge.



In May 2008 there were only the supporting pillars to





In October 2008, like was already a portion of the road visible.



The way was built as was fascinating





On 14 October 2009, the bridge opened

About 75% of the finished bridge can be seen in this picture.





The five lanes are clearly visible. The flag jewelry is from the inauguration



The bridge is designed to later times two railway tracks can be installed in the median strip.




was the bridge named after him:

HH Sheikh Khalifa bin Zayed al Nahyan

President of the UAE and Ruler of the Emirate of Abu Dhabi.



0 comments:

Post a Comment